About Our Project

Hatherop Primary is a happy, successful school located in a small rural village in the heart of the Cotswolds. For the last few years, however, the school has been grappling with overcrowding and a lack of space that is impacting pupils’ learning opportunities and safety. A deteriorating prefab classroom that was put up as a temporary solution to growing numbers in the early 1990s is now at significant risk of structural failure and is threatening the school with partial closure. That Hatherop Primary continues to provide a rich and nurturing learning environment is testament to the extraordinary staff that work there; but as a community we must act now to secure the school’s long-term future. 

 

The proposed solution is a comprehensive three-phase project aimed at enhancing security, expanding the undersized Year 4 classroom and replacing the aging prefab structure, known as the 'Elliot Building', with a spacious hall. The estimated cost for the combined works is £1.5m, and with very little statutory funding available, we are looking to raise the bulk of the funds from among our own community. 

Our Mission

Phase 1

Phase 1 will encompass relocating the existing school office on the first floor to a new, dedicated lobby on the ground floor that will allow staff to have clear sight of the school’s main entrance and strengthen security and safeguarding.  The existing office will then be used as a dedicated intervention space.

Phase 1 is expected to cost £150,000.  

How the school entrance currently looks.
View of proposed main entrance.
The undersized Year 4 classroom at Hatherop Primary School.
Aerial photo showing the undersized Year 4 classrom at Hatherop Primary School.
Architect's plan of the extended Year 4 classroom.

Phase 2

The second phase will see the extension of the existing Year 4 classroom, which is currently a little over half the size it should be according to government recommendations, making teaching and learning challenging.

Phase 2 is estimated to cost £185,000.  

Phase 3

The final and largest phase of work will involve demolishing the temporary and inadequate Elliot Building (currently used as the Year 5/6 classroom) to make space for a new and much bigger school hall with vastly improved facilities, including extra storage space and toilets. The existing hall will be turned into the Year 5/6 classroom with a small library. Phase 3 is estimated to cost  £1.2m.

The new hall will also be made available to the local community outside of school hours.

Aerial photo of Hatherop Primary School with the temporary Year 5/6 classroom circled in red.
Aerial view of the proposed new hall at Hatherop Primary School. (architect's drawing).